Jump to content
Geochemist's Workbench Support Forum

Flush and Cutoff Coupling


Bob Smith

Recommended Posts

I have been using React (Release 8.05 build 3829) to model a continuously stirred tank reactor (CSTR) using the “flush” option and have discovered the “cutoff” option does not work as I expected. I have run a set of simulation with

 

react .05 kg/day of Br-, cutoff = .1 kg

 

and

 

time start = 0 days, end = 7 days

time start = 0 days, end = 14 days

time start = 0 days, end = 21 days

 

for these three cases the total amount of Br- reacted from the React_output.txt files is 350, 700, and 1050 g, respectively. First, all these values exceed the 0.1 kg (100 g) “cutoff” and second there is a linear coupling between “cutoff” and the length of the simulation.

 

One of the input files is attached however I find this behavior in all the simulations that I have tried.

 

Thanks

 

Bob Smith

100818_Tracer.rea

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
×
×
  • Create New...